Vintage 1932 Greyhound Lines Print Ad
USD 20.00 USD
Original magazine ad, not a reproduction. In very good condition, with some creasing to the bottom from water damage. Exact dimensions (shown in inches and centimeters) are shown in second photo of print ad. Shipped carefully in archival bag and board in sealed stiff envelope. Will combine shipping at no extra cost.